|
Central & Eastern European Directory On-Line |
|
| Budget Hotels | Cheap Hostels | Philatelic Directory | Selected: | English Language Courses | MBA & Business Courses | |
| Rubtsovsk Machine Building Plant Joint Stock Company |
![]() |
| Key personnel | Name |
| Director General | Mr. Alexander A. Komaroff |
| Address | 204 Lenin Avenue, Rubtsovsk, Altaiskiy Krai, 658215, Russia |
| Tel. No. | +7 38557 2 37 55 |
| Fax No. | +7 38577 2 38 62 |
| Website address | http://rmz.rubtsovsk.ru |
| E-mail address |
rmz@rubtsovsk.ru |
| Year of foundation | 1959 |
| Type of business |
Production of:
|
| Ownership: | Joint Stock Company |
|
Historyof Rubtsovsk Machine - Building Plant In 1959 Central Committee of CPSU and USSR Council of Ministers came to the decision to organize a plant for manufacturing tracked vehicles in the Altai territory On December 26, 1959 a technical meeting approving detailed design on construction of tracked vehicles plant in the city of Rubtsovsk was held in the Construction Department of the territory Sovnarkhos (National economy council). That date - December 26, 1959 - became the foundation date of Rubtsovsk Machine-building Plant. Solomon L.Belakhov was appointed the first chief engineer and acting director of the plant. In 1960 Vasily S.Sorokin was appointed director of the plant. In 1961 block of shops Nol comprising stamping-and-press shop, welding-and-painting shop, mechanic shop, thermal and galvanic bay, tool shop, mechanic-and-assembly shop was put into operation. By the end of 1961 two first hulls of article `21` were manufactured. In March 1962 the main article `21` assembly line was put into operation. At the same time two first vehicles were assembled and handed over. By the end of 1962, the first batch of items (5 pcs) was manufactured. In 1963 Georgy P.KhiIko was appointed director of the plant. During the period of the 8th 5-year plan engineers and workers of the plant were working fruitfully on creation of new types of tracked vehicles - they brought modified vehicles GT-T (tracked tractor carrier) to quantity production. Timber-floating vehicle created at the plant on the base of GT-T was exposed at the Exhibition of National Ecnomic Achievement of the USSR, and the plant was awarded the First Class Prize of that Exhibition. In 1963 to GTT "21" vehicles a month were manufactured, and by the end of 1966 110-120 vehicles a month were manufactured. In 1965 Yuri G.Rudnev was appointed director of the plant. In 1967 Rubtsovsk Machine - building plant began manufacturing separate parts and units for BMP-1 (AIFV) that were delivered on cooperation to Kurgan Machine-building plant (final drives, transmissions). In 1968 Rubtsovsk Machine - building plant organized a branch for manufacturing vehicles GT-T in Semipalatinsk (Kazakhstan), and since 1977 Semipalatinsk branch began manufacturing GT-T and KLP vehicles (wheel-and-ski trailer). In 1983 that branch became an independent machine-building plant. In 1973 Rubtsovsk Machine-building plant produced first two BRM-1K vehicles (combat commander's reconnaissance vehicles) - article "676" on the base of Kurgan Machine-building plant. In 1976 Anatoly M.Perevoznov was appointed director of the plant. In 1983 the plant was awarded Order of the Red Banner and the USSR State Prize for creation of two-member tracked vehicles. In 1979 the plant began manufacturing PRP-3 vehicles (armoured reconnaissance vehicles), in 1980 - BMP-lKSh vehicles (AlFVs). In 1984-1999 modernization of PRP was carried out (articles "779", "503", "508", "509"). In 1992 the plant began manufacturing tracked railroad repair vehicles (GPL-520). In 1993 the plant started quantity production of BRM-3K vehicles, and since 1995 - RMG (tracked repair vehicle). Basing on units of BMP-1 (AIFV), a number oftraked vehicles for national economy was designed and put to quantity production. Since 1993 quantity production of the following articles began:
In 1997 Rubtsovsk Machine-building plant began fabricating asphalt paver-finisher PF-191 under licence of Blaw-Knox Co (GB). In 1998 the plant began quantity production of sowing-and-soil-cultivating complex PPK.-12.4 (operating width 12.4 m), in 1999 - manufacturing precise seeding machines STK. |
![]() |
Copyright © City Business Promotion Centre Ltd |